City of Orlando – Stormwater Improvements

About the Project

CLIENT

City of Orlando

LOCATION

Downtown Orlando, FL

SIZE

Multiple intersections

HIGHLIGHTS

Utility verification for stormwater improvements, Coordination with City staff, FHP and Flash-Rite, Inc.

SERVICES PROVIDED

  • Control Survey
  • Topographic Survey
  • Utility Designation
  • Utility Location

City of Orlando - Stormwater Improvements

City of Orlando Stormwater

Since September of 2000, SSMC has held a Continuing Professional Services Contract with the City of Orlando. As improvements for the city’s infrastructure are planned and executed, SSMC assists the city’s staff at all milestones, for the purposes of planning and design. Existing stormwater assets require constant maintenance and improvements are an ongoing process as the need for increased stormwater capacity rises. As a result, SSMC’s Land Surveying & Mapping and Subsurface Utilities Engineering (SUE) divisions were tasked with providing a comprehensive understanding of existing features and subsurface facilities at multiple signalized intersections in downtown Orlando.

To better facilitate stormwater planning and design, SSMC performed a topographic survey at each intersection in accordance with Chapter 5J-17 F.A.C. For the purposes of conflict mitigation and utility verification, the SUE division utilized non-destructive vacuum excavation methods for utility location (QL-A) in conformance with ASCE C-1-38-02 to open 6” wide by 6’ long trenches across each lane. This required all work to be done at night with temporary traffic control (T.T.C.) coordinated by Flash-Rite, Inc. as well as city staff and Florida Highway Patrol officers. Once all QL-A locates had been completed, survey technicians gathered the data, and SSMC office personnel prepared a drawing in AutoCAD Civil 3D 2017 for delivery. All utility verification efforts were performed in conformance of F.S. Chapter 556, Underground Facility Damage Prevention and Safety Act while complying with all OSHA, local, and state safety procedures.

Testimonials

“I had the pleasure of working with a couple of your employees over the past couple weeks. James Murphy and Beau Boyles; very professional and “can do” attitudes. They worked well with the crew from PSI and the task was completed one day ahead of schedule with no underground utilities damaged.”

Byron Osborn

NBC Universal, Orlando

“On behalf of our entire Project-87 team I want Southeastern Surveying to know that Mike Vetter and Ed Wolfrey set the Live Structural Steel Surveying performance bar to a new pinnacle with their Project-87 performance.”

Sean A. Murray Sr.

The Walt Disney Company

“Southeastern Surveying has been nothing but a pleasure to work with. Ian O’Gorman has truly been a great and trustworthy professional getting the jobs done in a clean and effective manner. Thank you for all of your hard work and efforts.”

TJ Kelley

Quanta Telecom Services

“We would like to take a moment to express our appreciation to the employees that worked with the City of Paxton Utilities Department. During the time we had the privilege of working with them; they were very professional and went above and beyond our expectations.”

Hayward Thomas

Mayor of the Town of Paxton

“Your guys out there were great, very professional and hard working.”

Scott Shelton

Rayken, Inc.

“Thanks again for a great job. Please let your team know how grateful we are to your tireless diligence in preparing a living database of information.”

Lisa Henry

City of Orlando