
SSMC has had the privilege of working on the new Panama City Beach SkyWheel project. SSMC performed the initial Boundary and Topographic Survey and provided Dutch Wheel with a high precision As-Built Survey of the bolt alignments and foundation piers for the wheel’s structural framework. We are currently working on additional topography and an existing condition As-Built Survey for the civil engineer. Once construction is complete, SSMC will provide a Final As-Built Survey of the site.